View Single Post
Old 04-24-2017, 07:06 PM   #1925
transplant99
Fearmongerer
 
transplant99's Avatar
 
Join Date: Oct 2001
Location: Wondering when # became hashtag and not a number sign.
Exp:
Default

Quote:
Originally Posted by Senator Clay Davis View Post
Because almost everything is already in place. The cost of the building? Flames got $450 million for that. Already CRL money in the area that can be drawn from too. The Stampede will willingly accept the location because they'll still get to make parking revenue from the location, unlike CalgaryNEXT where they'd be totally out in the cold. Location also allows for big shows to still happen during Stampede, which obviously drives revenue into the Stampede. As long as the CSEC isn't looking for everything and refusing the negotiate even a little, this seems very easy to get done, far, far easier than CalgaryNEXT. This could be fully operational before a single shovel even hits the ground for CalgaryNEXT. CSEC would be pretty moronic to not see this as the best option, no matter how badly they want CalgaryNEXT. Ken King said he wants something done quick, and this is the only thing that can be done quick.


Wait...what?

You think the Flames are still going to pony up 450 Million?

I seriously doubt that's the case.
transplant99 is offline  
The Following 2 Users Say Thank You to transplant99 For This Useful Post: