Bit of an update.
Just met the NSolv team at SAIT. Their process doestrogen laminate the need for steam. They saw a 95%+ recovery factor of the solvent on a material balance basis. Also the pilot used a single horizontal well pair so I don't think flood front control will be as much of a factor if they can get their well density right. All around looks like it could be a great step forward!
__________________
Quote:
Originally Posted by Biff
If the NHL ever needs an enema, Edmonton is where they'll insert it.
|
|