Dropped my Thunderbolt off at Cyclepath south today. Getting bearing kits installed in the pivot points and a volume spacer in the rear shock.
When this is done, I will get them to help me ensure my suspension is dialled in for my phat a$$.
Mulling over installing a new smaller front ring to get a little more range out of the current rear cluster
This rig will be ready to roll in March or April whenever the trails are open.
__________________
If I do not come back avenge my death
|