View Single Post
Old 11-30-2016, 09:27 AM   #3314
Fuzz
Franchise Player
 
Fuzz's Avatar
 
Join Date: Mar 2015
Location: Pickle Jar Lake
Exp:
Default

I would think Line 3 is going to get going quickly. It is basically a line replacement(with bigger pipe) that doesn't go through BC, crosses fairly easy terrain and I'm sure Enbridge is eager to replace the old one ASAP as it is not able to run at full capacity. Plus they get a jump on contracts over TC if KXL gets the go ahead.

TMX is probably going to run into protests and court challenges, even though it mostly follows an existing pipeline.
Fuzz is offline   Reply With Quote