Its been just over a year since Ive bumped this thread
I'd like to share what Ive accomplished in the last year or so:
I took down my main bath starting in early July last year. It took me about two weeks or so to have it operational again.
Here is before:
I stripped the room back to the studs and started over. It was an intense couple of weeks of work but once operational I could lay off the long hours and focus on the details. The last while Ive been working on those details. I spent the time building everything in this room. It is all custom. I am very happy with the results. Thought I would share.
I still need to replace the door to the room as it looks like a piece of garbage. I will do that this winter (at the same time as all my other doors on the main floor).
Now it is time to place focus on the outdoors.