View Single Post
Old 02-05-2016, 10:35 AM   #873
Fuzz
Franchise Player
 
Fuzz's Avatar
 
Join Date: Mar 2015
Location: Pickle Jar Lake
Exp:
Default

Well, the reason I was thinking this way is if I bring the hot to the switch first, then through the lights I have to run a lot more wire. Which means drilling through twice as many joists....But if that is the proper way to do it, I will.

There might be another circuit I can grab a hot from near the switch. I'll see what is on it. For now though, I've starting taking apart the kitchen and wow, whoever did this was a moron. Lots of shoddy work to clean up.
Fuzz is offline   Reply With Quote