Quote:
Originally Posted by tvp2003
I would assume, based on the land required, that the SE leg would start before the NC leg. However, based on the timeline, do you think they would complete the SE leg completely and then start the NC line? Or work on both at the same time?
|
It's hard to say. The only thing known is that any first phase will have to include some portion of the SE line, up to and including the new operations and maintenance facility (so likely up to Quarry Park station), as well as the downtown portion of course.
There has been musing about building both lines out from the middle, roughly simultaneously, as a conceptual strategy.