Quote:
Originally Posted by Peanut
They say pipeline and not flowline in the cbc article and the AER news release. Pipeline = below ground, flowline = above ground. No?
|
Yes, gathering line from one of the well pads. Volume spilled is about 45% of a day's production.
Not all oil, but a mixture that includes water and sand.