View Single Post
Old 06-05-2015, 11:59 PM   #415
You Need a Thneed
Voted for Kodos
 
You Need a Thneed's Avatar
 
Join Date: Dec 2007
Exp:
Default

Started demolition this eve in my kitchen. Not full out demolition, as we are going to need a semi functional kitchen for a couple of weeks yet.

I removed the hanging upper cabinets above the peninsula, took of the moldings all around the top, removed baseboard, and removed about 65% of the floor tile. Tomorrow I'll finish removing the tile and the underlay board, and scrape the stipple off of the ceiling. Also, I'll likely widen the entrance opening into the kitchen area( only a few inches to where it meets another wall), and raise the top of the opening right up to the ceiling, instead of having it at 6'8", or whatever it is currently.

I'll have to do a bit of electrical rough in prior to flooring.
__________________
My LinkedIn Profile.
You Need a Thneed is offline   Reply With Quote
The Following 3 Users Say Thank You to You Need a Thneed For This Useful Post: