View Single Post
Old 03-24-2015, 06:56 PM   #2204
calgarygeologist
Franchise Player
 
Join Date: Dec 2013
Exp:
Default

The city put up signs indicating that the south side of the Bow River pathway will be closed for a month between 14th street and 10th street. They are detouring folks to the north side pathway.

When is the city going to get around to putting in a new pedestrian pathway on the north side between 14th and 10th? They have a really ####ty, narrow, uneven and deteriorated pathway along the river bank that is designated for pedestrians and the cyclists get really pissed if you walk along their pathway that runs alongside Memorial.
calgarygeologist is offline   Reply With Quote