That Crowchild Study link indicates that the expected date for the end of the study-period is 2016. If construction of a new rink in the west village is contingent upon expansion of Crowchild, which makes a hell of a lot of sense, then I think we're talking about seeing drawings that have a better than 50% chance of being close to what gets built sometime in 2017, with a likely move-in date for the Flames around 2020. I suggest the moderators lock this thread.
|