I’d be willing to bet that this is a span/abutment interface issue with mounting points not lining up, rather than the bridge span itself being 10-12cm +/-. If it’s an interface issue, it will fall to PCL and their fabricator to fight over money. If the bridge is actually the wrong length and matches the latest rev of approved drawings, then it will be PCL and the city fighting about it.
Hopefully it’s a mounting issue and not an overall length issue. Fixing mount points could be as easy as coring new anchor bolts.
|