01-28-2015, 12:26 PM
|
#8
|
Franchise Player
|
Quote:
Originally Posted by Bring_Back_Shantz
Good call.
Let's blame he mayor for this one.
Why wasn't he personally reviewing engineering drawings, and doing QC checks with a measuring tape to make sure this thing got built properly.
Freaking Nenshi, always sleeping on the job.
|
Maybe he was drunk?
|
|
|