Quote:
Originally Posted by psicodude
The larger problem here is that the other Catholic high schools in the South are pretty much at capacity already and will only be worse in the coming years. So, do you gamble on the better location and possibly not having a high school for 5 or 7 years, or build in a less desirable location with a guaranteed opening of Sept 2017?
|
Could also be that they're thinking its better to take the funds and build the school now rather than wait and hope the money is there in the future? Especially if the province goes into a belt tightening mode.