Heavy rain will always have the potential to overwhelm the pumps on the stormwater tank for the tunnel. That's why there are the electronic signs all over, so it can be automatically closed temporarily. Of course, the question is "Why don't they design and build it so it can't do that?" The answer is, the costs would be astronomical. All roads are designed to flood in the heaviest rainfall events.

In this case, "flooding" means a couple of feet at most of water pooling at the low spot, which is very close to the west end of the tunnel.
Except in this case I believe they designed it (storage and pumps) to handle a much greater rainfall rate than has fallen so far and the pumps should have handled it. Might have been a temporary pump control issue with some kinks being worked out. If I recall, these were just commissioned recently.
__________________
BlackArcher101 is offline   Reply With Quote