View Single Post
Old 06-16-2014, 09:52 PM   #40
#-3
#1 Goaltender
 
Join Date: Mar 2008
Exp:
Default

Quote:
Originally Posted by 4X4 View Post
Just a half assed idea here, but maybe instead of a really expensive flood tunnel, we could do a little more business with the Tsuu Tina, and build a dry reservoir on their land, that we lease, which only gets used when the Elbow gets threateningly high.

Move around some earth to build a basin in an existing valley near the Elbow, and then build a diversion canal from the Elbow. Sounds wayyy cheaper than tearing up Heritage Drive and building a 5+ km tunnel. Plus the Tsuu Tina get some residual income out of it, and maybe we become (slowly but surely) business partners in many ways.
The way they do business we will go through 2 more floods and it will cost twice as much as they tunnel. And every time we are ready to walk away, they will pretend to be ready to approve it.
#-3 is offline   Reply With Quote