Originally Posted by ken0042 View Post
When I built my deck I submitted my plans, and the only time the inspector came out was after I was done. So even if you are part way done you could still apply for a permit.

How "not directly over the posts" are your beams? I assume the beams are sistered- is it a case where part of one beam hangs over, or is it barely hanging on?
I have two 2x8's nailed and glued as my beam. The beam span is 18 feet, but my 2x8's were only 16 feet long. So I sandwiched the two 16 footers together and added an extra 2 feet on each end. The 2 foot pieces are glued, nailed, carriage bolted, and have a mesh plate. It feels extremely secure, I just don't know if permit-wise this is acceptable. Did my explanation make sense?
__________________
"Illusions Michael, tricks are something a wh*re does for money ....... or cocaine"
MisterJoji is offline   Reply With Quote
The Following User Says Thank You to MisterJoji For This Useful Post: