Thread: Deck Help
View Single Post
Old 06-12-2014, 07:33 AM   #9
ken0042
Playboy Mansion Poolboy
 
ken0042's Avatar
 
Join Date: Apr 2004
Location: Close enough to make a beer run during a TV timeout
Exp:
Default

When I built my deck I submitted my plans, and the only time the inspector came out was after I was done. So even if you are part way done you could still apply for a permit.

How "not directly over the posts" are your beams? I assume the beams are sistered- is it a case where part of one beam hangs over, or is it barely hanging on?
ken0042 is offline   Reply With Quote