View Single Post
Old 05-12-2014, 08:43 AM   #789
You Need a Thneed
Voted for Kodos
 
You Need a Thneed's Avatar
 
Join Date: Dec 2007
Exp:
Default

Less than two weeks until the tunnel opens.

Over this lat weekend, they were adjusting the barriers at the ends of the road so that they were more in line with where they are required to be when the road opens.

I've mentioned it before, but they have the ability to completely close off the tunnel to traffic electronically, through electronic signage and the lane control system. I'm not sure exactly how the lane control system is going to be used, perhaps they will have the ability to change the direction of the interior lanes to the other direction, or simply turn one lane into a transit only lane.

Signage indicates that no dangerous goods, period, are allowed in the tunnel.

Line painting still needs to be done.
__________________
My LinkedIn Profile.
You Need a Thneed is offline   Reply With Quote