View Single Post
Old 02-18-2014, 12:16 PM   #1624
getbak
Franchise Player
 
getbak's Avatar
 
Join Date: Feb 2006
Location: Calgary, AB
Exp:
Default

Quote:
Originally Posted by Tyler View Post
Seems incredibly risky
How so? Integrate the station into the building and let the city build the tracks whenever they get around to it. That location would still be served by the existing C-Train routes, and would actually be better than the Dome because people on the NE-W trains wouldn't need to transfer to a south train downtown.
__________________
Turn up the good, turn down the suck!
getbak is offline   Reply With Quote