View Single Post
Old 11-28-2013, 12:03 PM   #170
SebC
tromboner
 
SebC's Avatar
 
Join Date: Mar 2006
Location: where the lattes are
Exp:
Default

Quote:
Originally Posted by Slava View Post
LOL. You tell me, Al.
The arguments in favor of this project aren't ROI/ridership based, but accessibility based. I.e. the SE portion of the green line is needed because service to the SE is currently below a minimum acceptable threshold, not because it's a cost-efficient area to develop. The NC portion of the line is different, as it serves a larger portion of the population and doesn't require major construction. (I'm assuming the NC part will not be built to LRT specs with this funding, only the SE. Bunk, can you confirm?)
SebC is offline   Reply With Quote