Originally Posted by stampsx2 View Post
Driving the se leg it doesn't look like very much has been going on since the temperature dropped. Work on the 22x macleod bridge looks to have come to a complete stop as well. I'm guessing work will resume once it gets warm out.
Whoever is doing that bandaid fix at Macleod and 22x needs a serious wake up call - it was a royal cluster there today. One lane closed, but no one monitoring so people were driving everywhere, sat e/b waiting while they blocked the entire road for 10 minutes. They're scrambling to finish something that probably should have been done a month ago, and they're not close.