the N/S section shouldn't have too much for construction zones on it, it looks done enough. Perhaps landscaping will require the speed limit to be 80 for a bit.
Quote:
Originally Posted by cavalera403
114th has curbs poured and they are just starting on working of laying down the road beds and it looks like they are twining 114th to meet up with 52nd.
|
That work is being done by the city of Calgary, not part of the SE Ring road.