View Single Post
Old 09-04-2013, 12:40 PM   #803
Barnes
Franchise Player
 
Barnes's Avatar
 
Join Date: Aug 2005
Location: Violating Copyrights
Exp:
Default

What's the deal with the SETWAY? Why is there not any consideration for improving the existing routes while the larger plan is in whatever study it is currently in?

The SEBRT and the local expresses are getting slower and slower daily. It is faster to travel from my house in Copperfield via the 153 to Sommerset and take the train downtown then it is to travel via the 153 to the 302 at rush hour.
Barnes is offline   Reply With Quote
The Following User Says Thank You to Barnes For This Useful Post: