What's the deal with the SETWAY? Why is there not any consideration for improving the existing routes while the larger plan is in whatever study it is currently in?
The SEBRT and the local expresses are getting slower and slower daily. It is faster to travel from my house in Copperfield via the 153 to Sommerset and take the train downtown then it is to travel via the 153 to the 302 at rush hour.
|