View Single Post
Old 09-04-2013, 12:05 PM   #244
rd_aaron
Scoring Winger
 
Join Date: Mar 2011
Exp:
Default

Quote:
Originally Posted by FlameOn View Post
Which is exactly what we don't want. If you want Wind to build a national network with the 700 block you'd want them to get two blocks and not just one. Verizon would definitely have had the capital to do that, I'm not sure Wind will. If they don't get enough spectrum Wind will get stuck as a third rate provider or stuck with fairly limited bandwidth with high network congestion.
Will Wind be able to go LTE with the new 700 MHz block?
rd_aaron is offline   Reply With Quote