View Single Post
Old 08-27-2013, 07:13 PM   #757
Jedi Ninja
Scoring Winger
 
Jedi Ninja's Avatar
 
Join Date: Mar 2009
Exp:
Default

I noticed they are replacing the pedestrian pathway along Parkdale Drive NW. Was this a result of the flood or was this started before the flood happened? I was just surprised to see work happening there as that route has other options, with both a bicycle path and a regular sidewalk in addition to the pedestrian path, and there is so much pathway repair work that needs to be done elsewhere in the city.
Jedi Ninja is offline   Reply With Quote