Why do you need a valve? If you are going to do stuff for the future, why not wait till you are ready for the installation? To valve and cap it off you are going to have to turn it off downstream then depending how much gas is in the pipe, possibly drain out the gas, then maybe purge with nitrogen, then test. Could be a lot of work for one valve, when you could just wait?
|