Quote:
Originally Posted by SebC
So basically, they had no need to be using the bridge in the first place.
|
Have you seen the two yards the bridge connects? My guess is they'll use the track they use to run cars to the CN yard on 50 Ave. Seems there's a connection to the other bridge. Not the easiest but with the amount if freight that moves between the two yards and beyond, not much other choice. People driving the 50 ave- Ogden ramp might be in for some long waits at that crossing.