Quote:
Originally Posted by Tron_fdc
|
If cleaning goes well, it should be a possibility.
They don't need an ice plant, they could get by without the jumbotron.
They would have to supply enough power to the building to get the concessions and lights going, but that could be a temporary connection if necessary. Concerts often run their own power distribution anyway, so they could just plug the lights and sound into a generator outside.
I'm guessing there will be a lot of this at the stampede to make it work. Use temporary connections, that will be replaced with permanent connections after the stampede.