There is no way this arena with this design can be built for this price tag. The contractor who get's this contract will end up in court, and half the sub trades unpaid. Fixed price contracts on complex iconic designs always result in cost overruns. I was talking with a weld inspector about the Peace Bridge today and how the company hired to fix the f'ups by the Spanish steel supplyer is probably going to go bankrupt becuse the general contractor won't pay them, and the city won't either. This will be like the Peace Bridge times 10.