I probably misspoke with the term "phase," at least at this juncture. What's going ahead right now is just a predesign study for the SETWay. The phases are to be determined this year, then can move ahead upon receiving funding.

From Ald. Shane Keating's blog dated Dec. 12th, 2012:

Quote:
Up to $10 Million has been set aside for a detailed SETWAY predesign study.

The detailed predesign phase will commence in the Spring of 2013 with the GreenTRIP funds.

  • The first stage is to finalize the alignment and station location. This will provide information on the land required including the new maintenance facility location.
  • The next stage is to look at a phasing plan to move from a dedicated bus-way to an LRT.
  • The third stage is packaging a phase that can be costed and if The City has money move to tender.