Quote:
Originally Posted by frinkprof
^I'm not sure if we're talking about the same thing here because I can't figure out what you're trying to say. Maybe a discussion best saved for/moved to the transit thread.
|
I'm talking about having the S line go east, become the SE line, and head back downtown. Might even be a good idea to start with the connection (i.e. go from Somerset to McKenzie, then build to downtown). Problem would be you'd need the downtown subway then.