View Single Post
Old 06-29-2012, 10:00 PM   #988
SebC
tromboner
 
SebC's Avatar
 
Join Date: Mar 2006
Location: where the lattes are
Exp:
Default

Quote:
Originally Posted by frinkprof View Post
^I'm not sure if we're talking about the same thing here because I can't figure out what you're trying to say. Maybe a discussion best saved for/moved to the transit thread.
I'm talking about having the S line go east, become the SE line, and head back downtown. Might even be a good idea to start with the connection (i.e. go from Somerset to McKenzie, then build to downtown). Problem would be you'd need the downtown subway then.

Last edited by SebC; 06-29-2012 at 10:06 PM.
SebC is offline   Reply With Quote