View Single Post
Old 05-19-2012, 12:27 PM   #38
KOgear
Scoring Winger
 
Join Date: Mar 2004
Exp:
Default

Quote:
Originally Posted by fotze View Post
I don't work in this side of the patch but have q's for those who do.

How do you deal with the long lead times to getting results. Would drive me crazy to see some production so far away. Also, do you need to get a whole wack of people to agree to changes since the dollar figures are so large?

Do you run out of digit spaces when doing economic runs on peep/mosaic/Aries? With numbers as high as this.

I heard a turnaround at a certain SAGD site was something like $130MM. Holy Christ!
Not sure if it's the same everywhere, but the way they have it setup here is people are given a cash amount to their signature, I've heard from 150k to 5 million.

But the total cost for a turnaround is not surprising as the cost of parts is ridicolous, intruments running in 10k amount and some interals at 800k and thats just part of a piece of equipment. Add in the labor to complete the work and the short amount of time to acomplish the work, the costs add up.
KOgear is offline   Reply With Quote