Thread
:
Photo tour of the Cenovus Energy Christina Lake drilling site
View Single Post
05-17-2012, 06:58 AM
#
5
oilyfan
Powerplay Quarterback
Join Date: Dec 2009
Location: SE Calgary
Exp:
In directional drilling the minimum radius achievable is around a 100 times the diameter of the pipe used to drill. So for a 4" pipe you make a turn with a radius of 400" or around 35 feet.
The Following 2 Users Say Thank You to oilyfan For This Useful Post:
bc-chris
,
TurnedTheCorner
oilyfan
View Public Profile
Send a private message to oilyfan
Find More Posts by oilyfan