View Single Post
Old 03-30-2012, 04:39 PM   #209
BloodFetish
First Line Centre
 
Join Date: Aug 2009
Location: Coquitlam, BC
Exp:
Default

Haha, build an elevator shaft to the top limit, then build your structure downwards.

If you hit ground before you're done then dig a big pit!

If you finish the building before you hit ground then add a pedestal!

(humour intended. starting at the top and working down would be crazy difficult I think)
BloodFetish is offline   Reply With Quote