Quote:
Originally Posted by V
TILMA kicks off at $75,000.00.
Virtually every design that costs more than $75,000.00 is contracted out. Before this project I wasn't aware of a single design over $75,000.00 that was ever sole sourced. I'm no bridge designer, but I'm pretty sure the design of this bridge cost more than $75,000.00.
Still, I'm happy they went for it on this project. Why not, on something as small as $25 mil?
|
I'm pretty sure TILMA didn't kick in before this project was awarded. As well, sole sourcing still happens in the private sector.