View Single Post
Old 10-26-2011, 10:39 PM   #859
ken0042
Playboy Mansion Poolboy
 
ken0042's Avatar
 
Join Date: Apr 2004
Location: Close enough to make a beer run during a TV timeout
Exp:
Default

So, this is what they are going with for a design:
Spoiler!


(I appologize for the crudity of the map. I did not have time do paint it or draw it to scale.)

Reasons why they are going with a Clover Leaf:
- It isn't a true Clover Leaf as the MacLeod Trail (MT) portion has it's own side roads for access, so MacLeod stays a free-flow.
- This is somewhat temporary; when/if the SW Ring Road is done there will be further upgrades. This keeps the cost down.
- Traffic patterns. The Province believes that when there is a major flow in 1 direction (ie- EB 22X onto NB MT will be at a different time than SB MT onto EB 22X.)

A few other notes:
- The 2 new bridges are to be constructed to the north of the current bridges. (light green on map.)
- The traffic lights at 6th street stay; will be upgraded as part of SW RR.
- Construction is to (hopefully) start Summer/ Fall 2012 and be done by Fall 2014.
ken0042 is offline   Reply With Quote
The Following 6 Users Say Thank You to ken0042 For This Useful Post: