View Single Post
Old 08-30-2011, 03:31 PM   #827
Bigtime
Franchise Player
 
Bigtime's Avatar
 
Join Date: Apr 2008
Location: Calgary
Exp:
Default

Quote:
Originally Posted by you need a thneed View Post
the nose hill drive interchange is out for tender. It looks like a lot of work - it includes:

A bridge taking nose hill drive over stoney trail
widening the existing stoney trail bridge over the cp rail tracks
a new bridge for the southbound lanes of stoney trail over the cp rail tracks
a new pedestrian bridge over the cp rail tracks
a wildlife underpass under nose hill drive
three pedestrian underpasses, under stoney, nose hill drive, and one ramp.
Quote:
Originally Posted by bunk View Post
over my dead body!! Grumble, grumble. What a waste. Silly hall! Druh farrell! Lattes!!
Where will the children play?
Bigtime is offline   Reply With Quote