Erlton/Stampede Station will soon join the list of those under construction to complete 4 car extension work. Work starts on July 29th and the south level-crossing will be closed for the duration of the work. So, outside of downtown, the following stations are under construction:

Brentwood
Canyon Meadows
Erlton/Stampede

While work is complete at Southland. As noted earlier, Chinook will join the list soon, perhaps by the end of the year. It will be closed, demolished and rebuilt without the station head building.
Whitehorn is still U/C too.

Here are some iPhone pictures from this evening:

Brentwood Station extension:


Centre Street Station - fencing for extension area:


Olympic Plaza Station demolition:


64th Ave tunnel - North of MKWW station:



Martindale Station outbound (inbound station lights are not on yet):




I got off the train at MKWW, walked the wrong direction to halfway over the pedestrian bridge to take the tunnel pic, then started walking home, stopping for a slurpee, and taking some pics of Martindale station before getting on the bus close to Martindale Station - the very same bus I'd have got on had I just waited for it at MKWW.

Ticket stamped at Brentwood at 8:50 pm, got home at 10:35 pm.