View Single Post
Old 06-24-2011, 09:31 PM   #493
frinkprof
First Line Centre
 
frinkprof's Avatar
 
Join Date: Dec 2009
Exp:
Default

Some photos posted by yyc_engineer on SSP.

Quote:
Originally Posted by yyc_engineer on SSP
Hey everyone, here's a couple more insider pics from the construction. Work is progressing right on track, just a year and a half to go until opening day!


Looking West in the trench towards 69th St Station


Location of the diamond crossover inside the tunnel at 69th Station.


Tracks at 47th St. at-grade crossing


Tracks overtop the LRT bridge over Sarcee Trail

Sorry for the crappy quality of the pics. I took them with my iPod touch since I lost the camera my work gave me lol
frinkprof is offline   Reply With Quote
The Following 2 Users Say Thank You to frinkprof For This Useful Post: