But thats the problem, there was nothing in this process that was lowest bidder. They merely accepted the design and the conditions that went with getting it built.
|
I believe it was just the design that didn't go out to tender. I believe the contruction contract (won by Graham) and Structure contract (won by El-Esteel Espania Limitado) went to tender.
There are a few key issues with the bridge and the process behind it, but the majority of opponents to the bridge just use buzzwords and issues pushed by the media hype against it.