Some potentially helpful notes and maps.

Future NE LRT route.



Future Airport Transit Service



Note: this is the plan on the assumption that the airport tunnel is not in place, if it is in place, route 100 shifts to use the tunnel rather than Country Hills Blvd.

- Barlow Trail connection to airport is slated to close April 3rd

- McCall Way is currently being being re-aligned to converge with the (new) end of Barlow Trail at a new traffic circle just north of McKnight Blvd. There will still be no terminal access, just to the airport services area south of the terminal. Should all be done by the April 3rd Barlow closing, or have a delayed opening not long after that.

- The other road change currently being worked on in the area is the 36th Street connector. This will extend 48th Ave. eastward, then curve north, on the east side of the golf course and connect with 36th Street. This will open in the spring/summer as well. The map below roughly shows the alignment of this new road.