Quote:
Originally Posted by bizaro86
That seems like the sort of thing that could provide a significant improvement in reliability at a very modest cost. Calgary probably has 1000 people with debottlenecking skills, why not fix that?
|
Doubling up the switches and either end of downtown would be HUGE (when I took transit they were often the failure point). I wonder how much they'd have to disrupt service to do it though.