What I recall from him saying was that short term solutions (like BRT) would not work in the SE, and if elected he would do everything he could to get the SE LRT started as soon as possible.
What he mentions on Facebook is similar to what he said before; build it to Riverbend or Douglas Glen. Neither is walking distance for me- but my thought is to get the hard infrastructure done as soon as possible. We have all seen the massive engineering going into the West LRT- get that stuff closer to the core done; the deep SE has right of ways ready to go.
Edit- did some more reading and found this:
And it is time to plan. Calgary’s transit plan is ad hoc and not aligned with the growth of the city – Council sneezes and the entire plan changes. We need a Calgary Transit City plan that includes:
•Priorities after the SE LRT and the Stephen Avenue Tunnel, including a North-Central line that actually goes where people live