Quote:
Originally Posted by Beerfest
How much would it cost? The same as other transit?
|
To build: $500M according to the article, although that is just an estimate for this particular routing proposal.
To ride: Probably the same as the rest of transit, if it would indeed be operated by Calgary Transit. If the airport builds their own train, who knows?