View Single Post
Old 08-17-2005, 12:00 PM   #5
Tron_fdc
In Your MCP
 
Join Date: Apr 2004
Location: Watching Hot Dog Hans
Exp:
Default

Shane Homes in Cougar Ridge.

I got a deal on the house, deal on the lot, deal on the upgrades and the house was built in 3 months as promised. The reason I got such a smiking deal was because the lot had been sold 3 times and the deal fell through each time, it was the last lot in the phase, and they wanted to get rid of it. The house hadn't been built anywhere else (it was a new design) and all I could look at were floor plans. They also had a deal on walkout basements that month (free walkout upgrade) for buying in August (typically their slowest month). I have a lot of tradesman friends, and they checked the construction the whole way through and had nothing but good things to say about it. I was so happy they had me write a testimonial for their newsletter in exchange for a Hy's gift certificate.

I've made over 100 g's on my house so far because I looked for a deal in the right place at the right time.....so search around and ask for deals or incentives before you commit to anything.
Tron_fdc is online now   Reply With Quote