View Single Post
Old 03-26-2009, 08:57 PM   #3
Ashartus
First Line Centre
 
Join Date: Mar 2007
Location: Calgary
Exp:
Default

When I did mine I only needed 1 inspection (the final inspection) since the rough-in was already done. It wasn't that long ago so I don't think it would have changed, though you can always call 311 to confirm. There isn't really much to inspect between the rough-in and final - you pretty much just have to run the water to the bathroom and install everything.
Ashartus is offline   Reply With Quote
The Following User Says Thank You to Ashartus For This Useful Post: