When I did mine I only needed 1 inspection (the final inspection) since the rough-in was already done. It wasn't that long ago so I don't think it would have changed, though you can always call 311 to confirm. There isn't really much to inspect between the rough-in and final - you pretty much just have to run the water to the bathroom and install everything.
|