The Main Raft slab is being poured, which will basicly support the load of the building, as concrete pours go this is massive, 100m3 pours are going all over the city every day and sometimes take hours to complete, depending on rate of pour. I think the rate for this is going to be pushing 450-500 m3/hr, which mean a truck loads somewhere every 5 minutes at four concrete plants over the city, Factor in drive times and Saturday traffic, I think the 6th ave bridge is on schedule, but this pour is contingent on 6th ave opeing.