View Single Post
Old 04-30-2008, 03:42 PM   #20
ken0042
Playboy Mansion Poolboy
 
ken0042's Avatar
 
Join Date: Apr 2004
Location: Close enough to make a beer run during a TV timeout
Exp:
Default

Quote:
Originally Posted by Tron_fdc View Post
Yeah, I think that according to the building code you have to have piles a minimum 3 feet deep that support a deck that is higher than 3 feet in height. If your deck is less than 3 feet tall you don't need piles (according to code) but I'd do them anyway.
Very close. It's piles 4 feet deep for a deck higher than 2 feet off the ground. 3 feet is the frost line in Calgary, so the extra foot is for good measure.

Just to add, if you can't get a Bobcat into your yard for whatever reason, looks at renting a 2 man auger, and bribe 3 strong friends with beer. (A 2 man auger works best with 4 guys.)
ken0042 is offline   Reply With Quote