Quote:
Originally Posted by StoneCole
...the info Claeren gave about the LRT is pretty accurate as far as I can tell...the north line is some 20+ years away, and I believe the high-speed train and the LRT are supposed to share the right-of-way in the north-central.
|
i believe the downtown-north line of the lrt is to follow centre street, not along deerfoot trail (as previously proposed in late 2007)
the infrastruture used for the high speed train is different from the current lrt system and space along the CP R.O.W. (i think its the cp tracks that are being considered for the high speed train) is limited to one track for safety reasons